Hospital Name: Second hospital
Working place:Meeting with the Second hospital administration Working contents: From right side low row: Dr.Ts.Bilegtsaikhan, deputy director of strategy and policy development, Dr. Ts.Soninkhishig (Sonya), CEO of “ToodogNaran” Co., Ltd, Dr.D.Ganzorig, deputy director of diagnostics and treatment From right side upper row: Ms.Uyanga, head of internal control and hygiene department, Mr. D.Odonchimed, CEO of “Tana lab” Co., Ltd, Ms.A.Enkhtungalag, Head of quality control department of State Inspection Agency Laboratory of Ulaanbaatar, Dr.Battsetseg, bacteriologist of the hospital |
|
Working place:Room observation of the second hospital Working contents: Intensive care unit of the hospital |
|
Working place:Room view to be coated Working contents:This ICU rooms take critically ill patients with multiple infections. There are 2 such rooms and they are isolated from bigger ICU room with glass doors and have partition in between, also made with glass. One room has a window, the other room does not have window. The size of the room A 7×3.130×2.7m, total 98.4 sq.m The size of the room B 7×3.130×2.7m, 102 sq.m (including glass walls, ceiling, walls, some permanent furniture, double glass doors, window surface etc coated) |
|
Working place:Room view to be coated Working contents:This is emergency operation room to be coated. The size of the one room is 8x6 = 48 sq.m The ceiling is 3m, total 140m2 |
Arrival at the hospital | ||
Arrival at the hospital | ||
Operation room No3
Preparation |
||
Operation room No3
Preparation |
||
|
Operation room No3
Cleaning |
|
Operation room No3
Cleaning |
||
Operation room No3
Cleaning |
||
Operation room No3
Cleaning |
||
Operation room No3
Cleaning |
||
|
Operation room No3
Initial bacterial count and after cleaning with electrolyzed alkaline water with steam cleaner |
|
Operation room No3
Bacterial test before InviroshieldM5 application. |
||
Operation room No3
Bacterial test before InviroshieldM5 application. |
||
Operation room No3
Application of basecoat |
||
|
Operation room No3
Application of basecoat |
|
TV program making | ||
TV program making
Interview of deputy director Dr.Ts.Bilegtsaikhan Interview of Mr.D.Odonchimed, director of Tana lab |
||
TV program making
Interview of deputy director Dr.Ts.Bilegtsaikhan Interview of Mr.D.Odonchimed, director of Tana lab |
||
TV program making
Interview of deputy director Dr.Ts.Bilegtsaikhan Interview of Mr.D.Odonchimed, director of Tana lab |
||
TV program making
Interview of deputy director Dr.Ts.Bilegtsaikhan Interview of Mr.D.Odonchimed, director of Tana lab |
||
|
Intensive care unit room A and B | |
Intensive care unit room A and B | ||
Intensive care unit room A and B | ||
Intensive care unit room A and B | ||
Intensive care unit room A and B | ||
Intensive care unit room A and B | ||
Intensive care unit room A and B
Glass walls |
||
Moving between rooms | ||
|
||
|
Bacterial testing of ICU room
Before and after photocatalyst application |
|
|
Final meeting with hospital administration:
From left hand side: deputy director Dr.Ganzorig, director general Dr.Amarjargal, Tana Lab Co., Ltd director Mr.D.Odonchimed, deputy director Dr.Ts.Bilegtsaikhan Administration expressed their gratefulness and appreciation for the participation in the project to UNIDO Japan, Marusyo Sangyo Co., Ltd and people of Japan. |
|